“Building on Faith, Family, and Tradition” – Phase II

In 2018, Pensacola Catholic High School introduced the “Building on Faith, Family, and Tradition” capital campaign in order to provide funding for the numerous major campus improvements identified in the Master Growth Plan. COVID hit us in 2020 and we put the campaign on hold, but now it is time for us to begin Phase II or ‘CC23’ as we might refer to this rejuvenated effort. Thanks to the generous support of many donors in Phase I, we have already made incredible progress toward the list of items that were in the Master Growth Plan. We have recently updated the Master Growth Plan to add some additional needs that have come to light in the past several years and to reprioritize our projects. You can see the full list of projects from both phases below.

We cannot complete these projects without the help and generosity of the entire Catholic High Family. With your donation, we invite you to become a part of the Catholic High legacy by partnering with us in completing these remaining projects. Every donation has a significant impact and helps us to reach our goal. We ask you to prayerfully consider a sacrificial gift that can be paid over a 5-year pledge period.

All donors to the campaign will be recognized in our Annual Report during the next five years as pledges are being paid unless donors wish to remain anonymous. Gifts made in the first phase of the campaign will be added to any new gifts to determine recognition levels.  Be a ‘Pillar of Catholic High’ by donating a minimum of $100/month or $6,000 over the 5-year pledge period to have your name included on a ‘Pillars Plaque’ at the giving levels below. Reference our Gift Calculator linked here to see other periodic gift options that accumulate to provide significant impact to our goal.

Click here if you are interested in Naming Opportunities.

 

If you prefer to make your pledge via mail, please complete the Letter of Intent and mail to Pensacola Catholic High School, 3043 West Scott Street, Pensacola, FL 32505.


Plan Overview

Developing the whole student, spiritually, academically, socially, and physically is
essential to the mission of Catholic High School. Along with having developed a legacy
of excellence over the past 80+ years, Catholic High believes that students and faculty
will benefit from the new buildings and facilities that will provide more opportunities for
academics, athletics and the arts to flourish. Support of our Building on Faith, Family
and Tradition campaign will allow this dynamic vision to benefit the entire Pensacola
Catholic High School community now and for years to come.

PHASE II Projects:

  • New Classrooms ***COMPLETED***
    Construction of three new general-purpose classrooms to accommodate expanding enrollment.
  • Music Building
    Replace windows and renovate restrooms that are original to the original construction of the building.
  • Boyden Family STEM Innovation Center and Terhaar Family Studio Art Facility
    Renovation of the previous Cafeteria building into a new Robotics/STEM lab and Art Studio.
  • Practice Fields
    Construction of three athletic practice fields with restroom facility, parking lot, and access road on the southeast of the campus footprint.
  • Baseball/Softball Facility Improvements
    Construction of new restroom facility, new dugouts for Softball and a new locker room/storage building.
  • New Administrative Offices
    Construction of five new general-purpose administrative offices and a canopy to connect buildings.
  • Brent Library/Media Center
    Renovation of the existing Library space for a more diverse use by students, faculty, and the entire CHS family.
  • Campus Security
    Enhancements to fencing and other security components as the campus footprint expands.

 

PHASE I Projects Complete:

  • Security
     o Renovation of the Main Lobby and Office entrance for secured access control.
     o Construction of a fence line that fully encloses the campus buildings with secured and controlled access to ensure that only screened visitors can enter school halls and classrooms.
     o The construction of perimeter fencing and gates to lock-down access to the academic buildings.
  • Tolan Family Student Life Center – A new Student Life Center that replaced the previous cafeteria, providing a gathering space for spiritual and social growth of students, parents, faculty, and alumni.
  • Nickelsen Family Courtyard – Paved seating area outside of the Tolan Family Student Life Center.
  • Athletic Complex – New Fitness Center for use by all CHS students, faculty and athletic teams, for overall health and fitness enhancement as well as new and enlarged locker rooms. A new training room was also included to provide for preventive, as well as rehabilitative care of students by the school’s athletic trainer.
  • Stadium Restroom Facilities – New restroom facilities constructed at Gorecki-LeBeau Stadium to add much needed improvements for Crusaders and visiting team spectators.
  • Music Building – Renovation of the previous Weight Building, that was originally a Music Building in the 1960’s to a functioning Music facility to support our growing Band and Music programs.

Campaign Prayer

God of love and truth, we turn to you in all that we undertake. As we commit ourselves to the improvement of Pensacola Catholic High School in this campaign, we ask you to pour out your blessings upon all who participate. We are driven by a desire to further the formation and education of your sons and daughters in this place. Help us, by your most powerful grace, to build faith, to build family, to build tradition as we continue to build Catholic High. Amen.

New Classroom Wing Groundbreaking

New Classroom Wing Construction

Parent Goal

Overall Goal